Browse Items (13651 total)

Jackpine 70-80% stocking after scarification (pads & chains). Camp 17 Dryden Paper Co., cf slide #555

Jackpine 40-50% stocking after scarification (pads & chains) 1963. Ht. 3-7ft. Camp 17, Dryden Paper Co. Person is Fred Robinson.

Regenerated jack pine. Great Lakes Forest Products, Thunder Bay.

Tags:

Jackpine planted in 1975, after 3 yrs. Area site prepared with 'rippers'. cf slide #1438. Limestone, Nipigon. The person is George Marek.

Tags:

Jackpine 2+0 planted 1964 after clearcutting and site preparation (barrel at 7 yrs. cf. slide #148. Davidson Twp. Englehart Man. Unit

Jackpine cutover treated with anchor chains 1963. 2 years jack pine seedlings resulting from treatment. Hyndman Twp. Dryden Paper.

Jackpine cone and seedlings from cone seed. Photo R.J. Fessenden.

Jackpine clearcut 1970. Dunmore Twp. Engelhart Management Unit

Jackpine clearcut 1970. Dunmore Twp. Engelhart Management Unit

Jackpine clearcut using a Koehring Processor. Great lakes Camp #511 (now Avenor). Dor River.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2